Panel swaps scheduled around your power company's disconnect(000) 000-0000

Rows of breakers in a newly fitted electrical panel

Electrical Panel Upgrades in Medina

Whether that means replacing the panel, enlarging the service or keeping what is there, we explain which fits, then time any change around the utility's disconnect.

Ask about your panel — (000) 000-0000

Overview

Understanding Your Panel Options

A panel upgrade is a significant job, so it should only happen for a good reason: no space, not enough capacity, or a panel with a poor safety record.

We run a load calculation and explain the options, including keeping what you have if it will carry your plans.

When an upgrade goes ahead, we book the utility disconnect and reconnect to keep the outage short.

Your options

Options We Explain

  • Keep the panel

    If capacity and condition allow.

  • Replace like for like

    Same size, safer equipment.

  • Upgrade the service

    More capacity for future loads.

  • Add a subpanel

    Extra space where it is needed.

How we do it

Changeover Day

  1. 1

    Disconnect

    The utility shuts off service at the booked time.

  2. 2

    Replace

    New panel fitted, circuits transferred and labelled.

  3. 3

    Restore

    Inspection passed, power back on.

Want the options for your house?

Book a free walkthrough and we will lay them out, with a written plan to follow.

Ask about your panel — (000) 000-0000